DSI PBL® Bypass System initially requested for a
Split Flow application in Qatar, successfully delivered LCM material.
case history Details
Location
Qatar
tool/application
DSI PBL® Bypass System
Hole Size
12 ¼-in. hole sidetrack
challenge
Unexpected losses were encountered during the early stages of drilling, so the PBL® needed to be activated four times during this operation.
Footage/activations
29,770 total feet / 4 Activations
max flow rate while drilling
1,000 gpm